Showing posts with label painting. Show all posts
Showing posts with label painting. Show all posts

Thursday, November 3, 2011

Our Week So Far:

  1. Still no news on surgery
  2. A good amount of time spent doing this:  

   3.  Scott spending everyday at the hospital - and still working on the house upon coming home.  
   4. Usually doing this:
Or working on wiring.....                     .
   5. Lucy's surgery for her destroyed knee finally scheduled - let's hope Scott's surgery day doesn't end up at the same time.
   6. Refer to #1 again.  
   7. Trying to stay on top of school and get as many projects out of the way as possible before I'm caring for two little post-op patients here at home in the next few weeks :)

We're trying to be patient - the waiting is the hardest part.  However, we know that everything happens for a purpose and the timing will be perfect in the end.  It's just difficult to sit on this side of it all, not knowing, while everything gets decided upon and worked out.  

Saturday, October 29, 2011

Final Countdown

We have scheduled the floor guys to come NEXT WEEK!  This means we are on a time crunch and still have so much to do!  Trim, closet doors, fixing windows, installing light fixtures and getting plumbing fixtures hooked up. The floors being sanded down and refinished is huge as this is the last big step before moving in!
After that we are basically set!  We are getting excited, but also feeling the pressure.  Scott starts his ICU rotation on Tuesday (going in almost every day with 30hr days every three days) so the timing is perfect as he will basically be worthless outside of the hospital.  I am so grateful for such a hard working, motivated husband.  He really has been such a trooper - working his shifts at the hospital and then coming home and working 4-8 hours on the house (or working those hours and then going into the hospital at night).  I am just so blessed to have such a stellar dude that I'm married to and had to brag a little at how well he provides for us.
Here are a few pictures.  All the details are coming together and we are slowly scratching off details on Vinnie's final list
.  
Trying to decide on paint colors...
Erica and Roman in bedroom #1 with the new paint (ignore the shelving to your right - it will be moved eventually)
Bedroom #2 - painting in progress (it's finished now)
Aaaaaand bedroom #3 - still need to scrape that window down and prime and paint it.
Putting our last craigslist appliance, the double oven, in - it was a beast to deal with, but is absolutely beautiful :)  If an oven can be beautiful...
Installing the hardware our neighbor found for us at a garage sale which we painted to coordinate with our kitchen.
Fans and light fixtures going in (don't worry - we'll put the blades on soon)

Friday, October 7, 2011

The details that matter

The last two weeks have been full of finish carpentry.  We've been putting up crown moulding, hanging doors, painting, and working on plumbing and electric work like crazy.
A stack of trim - ready to go up.
 Vinnie found us a fabulous deal on moulding/trim at a warehouse and they practically gave it to us.  We're so happy to have someone on our side who knows where the good deals are and who knows how to talk his way into an even better deal before you even know what's happened.

Kinda blurry picture of the crown moulding in the living room

Here's the front bathroom.  We bought the vanity at Home Depot, I painted the walls in Arabian Sands (by Behr), and we're doing the oiled bronze fixtures for a little added flair.  Yesterday Vinnie put a door on that bathroom. Today Scott's putting in the drain on that shower and finishing the plumbing for it and the toilet, which we bought yesterday, so we can finally have a somewhat working bathroom over there!

Scott's dad came down for three days last week (he was a trooper with his recently operated on broken ankle and all).  We set up little work stations with comfy stools for him and he helped Scott figure out the rest of the major electric work.  Scott's been working on connecting everything throughout the house for the last few weeks now.  A big task considering we have about 150 outlets and light switches alone (not including light fixtures) - the more the merrier, right?

Another big project has been the master bathroom shower.  We were originally going to do an Acrylic shower insert which we special ordered through Home Depot.  Three days after it was supposed to arrive, a few weeks ago, they told us it was back ordered for at least 5 more weeks.  Such a frustration.  SO, back to the drawing board.  We decided to go with a tile shower, but were afraid of leaking, due to the fact that we have heard only horror stories of completely tiled showers which crack and leak within a few years.  Because we really like the brand new sub floor we put in throughout that whole area of the house, we decided to play it safe and hopefully avoid leaks and termites and rot and all the fun things that come along with water seeping into places it shouldn't, with a fiberglass insert for the base.
I painted the room last week and we went shopping for the tile on Monday evening.  We picked out a marble tile from our local flooring outlet place for $1.99/sq ft and love it.  

Scott found the glass tile border on clearance at Home Depot.  We have enough to hopefully carry that through to a back-splash for our vanity and maybe around the bathtub in the room?  Details that can be added later as we go. 
Our tile man is over there grouting everything as we speak and will be done with it today so Scott can move onto the plumbing in that room next.